Midwest Energy Cooperative |
Project Scope
Tier III hardened datacenter - Included the users server, SCADA and ISP Clients and co-location clients equipment. Operations wing - Vehicle and equipment storage, including covered vehicle storage; warehouse and enclosed material storage; separate vehicle maintenance building. The data center was designed per Telecommunications Industry Association (TIA) and “TIA-942 Telecommunications Infrastructure Standard for Data Centers”. The mission control space was designed with redundant systems. All exterior equipment was placed in a hardened screen. The entire space was designed to follow the FEMA 361 hardened criteria and 250 mph F5.
Tier III hardened datacenter - Included the users server, SCADA and ISP Clients and co-location clients equipment. Operations wing - Vehicle and equipment storage, including covered vehicle storage; warehouse and enclosed material storage; separate vehicle maintenance building. The data center was designed per Telecommunications Industry Association (TIA) and “TIA-942 Telecommunications Infrastructure Standard for Data Centers”. The mission control space was designed with redundant systems. All exterior equipment was placed in a hardened screen. The entire space was designed to follow the FEMA 361 hardened criteria and 250 mph F5.
Missouri Address
18207 Edison Ave. Chesterfield, MO 63005 Illinois Address 8201 W. 183rd St. Suite B Tinley Park, IL 60487 |
Email
[email protected] |