Tier III hardened datacenter - Included the users server, SCADA and ISP Clients and co-location clients equipment. Operations wing - Vehicle and equipment storage, including covered vehicle storage; warehouse and enclosed material storage; separate vehicle maintenance building. The data center was designed per Telecommunications Industry Association (TIA) and “TIA-942 Telecommunications Infrastructure Standard for Data Centers”. The mission control space was designed with redundant systems. All exterior equipment was placed in a hardened screen. The entire space was designed to follow the FEMA 361 hardened criteria and 250 mph F5.
Tier III hardened datacenter - Included the users server, SCADA and ISP Clients and co-location clients equipment. Operations wing - Vehicle and equipment storage, including covered vehicle storage; warehouse and enclosed material storage; separate vehicle maintenance building. The data center was designed per Telecommunications Industry Association (TIA) and “TIA-942 Telecommunications Infrastructure Standard for Data Centers”. The mission control space was designed with redundant systems. All exterior equipment was placed in a hardened screen. The entire space was designed to follow the FEMA 361 hardened criteria and 250 mph F5.
Email
[email protected] |