SSC Engineering, Inc.
Menu

Effingham Police and PSAP

Request A Quote
Project Type
New Police Station and PSAP Dispatch Center

Location
Effingham, IL

Project Size
26,500 sf

Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, Structural
Utility Set Exhaust Fan
Project Scope
New construction of a 3-level police station complete with a processing and detention areas and a six workstation PSAP dispatch center located in the structurally hardened ground level, an IT/Server room with redundant HVAC and electrical systems and raised access flooring, a pre-action suppression system, fiber and copper connections to the county dispatch and a police station complete with processing and detention area. Entire building is backed up with on-site generator power and an additional portable generator connection.
SSC Engineering
About    Careers    Contact    Markets    Our Team    Services    Quote​    Where Licensed

Missouri Address
18207 Edison Ave.
​Chesterfield, MO 63005


Illinois Address
8201 W. 183rd St. Suite B
Tinley Park, IL 60487

Telephone
T: 636.530.7770



T: 708.401.3161
​
Email
ssc@sscengineering.com
  • Home
  • About
  • News
  • Markets
  • GSA Overview
  • Services ›
    • Mechanical
    • Electrical
    • Plumbing
    • Fire Protection
    • Structural
  • Our Team
  • Careers ›
    • Marketing Coordinator
    • Electrical Consulting Engineering
    • Electrical Consulting Eng. Entry Level
    • Lead BIM Modeler/Technician
    • Mechanical Engineer-5 to 10 Years
    • Structural Engineer
  • Contact
  • Home
  • About
  • News
  • Markets
  • GSA Overview
  • Services ›
    • Mechanical
    • Electrical
    • Plumbing
    • Fire Protection
    • Structural
  • Our Team
  • Careers ›
    • Marketing Coordinator
    • Electrical Consulting Engineering
    • Electrical Consulting Eng. Entry Level
    • Lead BIM Modeler/Technician
    • Mechanical Engineer-5 to 10 Years
    • Structural Engineer
  • Contact