BJC Parkland Hospital
|
Project Scope
Addition and renovation project that included 3 new trauma rooms, 11 treatment rooms, additional waiting space, 2 new nurse’s stations, restrooms, clean and soiled utility, break room, med rooms, decontamination room and a new boiler room. Two new redundant, dual-fuel propane and natural gas boilers were added for hot water heating and the existing rooftop unit was replaced with a new larger unit to serve the entire existing and expanded E.D. spaces. A new emergency power distribution panel and ATS were added to serve the increased load. The existing utility transformer had to be relocated to accommodate the new footprint of the building.
Addition and renovation project that included 3 new trauma rooms, 11 treatment rooms, additional waiting space, 2 new nurse’s stations, restrooms, clean and soiled utility, break room, med rooms, decontamination room and a new boiler room. Two new redundant, dual-fuel propane and natural gas boilers were added for hot water heating and the existing rooftop unit was replaced with a new larger unit to serve the entire existing and expanded E.D. spaces. A new emergency power distribution panel and ATS were added to serve the increased load. The existing utility transformer had to be relocated to accommodate the new footprint of the building.
Missouri Address
18207 Edison Ave. Chesterfield, MO 63005 Illinois Address 8201 W. 183rd St. Suite B Tinley Park, IL 60487 |
Email
[email protected] |