We are happy to announce that the recently-constructed US Bank in Westport (Maryland Heights, Missouri) has achieved LEED Certification. SSC Engineering worked alongside KWA Architects to design the ground-up 4,000 square foot branch location which had a total construction cost of just over $1 million.
The facility received LEED Points for controllability of lighting and thermal systems, thermal design and verification, optimized energy performance, and water use reduction among many other environmentally minded features. Thanks to KWA Architects and US Bank for helping make this project a success.
